UH1H HP
Modification and Upgrade Program

Engineering/Technical
- Approved FAA Flight Manual
- Aircraft Publications; IPB, Maintenance Manuals, Wiring Diagrams
- Inspection Program:
   25/ 100/ 300/ 600/ 1000/ 3000 hours inspections.
   Daily, 3 months/ 6 months/ 12 months/ 5 years Inspections
- Technical Support

Engine Upgrade
- Upgrade from T53-L-13B (1-000-060-10 to T53-L-703 (1-000-060-31)
- 50% remaining life on all life limited parts or better. Time since Overhaul, 0.0.
- 28% more take off power
- Lower operating cost
- Improved durability for corrosive environment
- Improved performance, more power, Higher Payload, and High/Hot Capability

Structural Upgrade
- Main Life Beam Upgrade
- Landing Gear Tunnel Upgrade
- New DART Low or High Landing Gear
- Pylon Cover Upgrade
- Engine Deck Upgrade
- Oil Cooler Upgrade
- AFT Fuselage/ Tail Boom Attachment Upgrade
- 212 Tail Boom: BLR Dual Tail Boom Strakes and BLR FAST Fin System
- Tail Rotor Tractor Push Pull Control Tubes
- 212 Elevators (No Ad's)

PDF Format


Page: 1, 2, 3, 4, 5, 6

back to top