UH1H HP
Modification and Upgrade Program

Aircraft Refurbishment
- All flight controls removed, cleaned, inspected, greased, and painted
- All compartments inspected and painted
- All systems removed, cleaned, inspected & re-installed with new hardware
- All windows replaced with acrylic
- Painting of aircraft interior and exterior
- Weighing of aircraft
- Flight testing and main and tail rotor balancing

Component Upgrade
- All components will be delivered in Overhauled condition
- 50% remaining life on all life limited parts or better, unless noted
- New 212 Main Rotor Blades
- 212 Main Rotor Head (New Straps Installed)
- New 212 Mail Rotor Mast Assembly
- 212 Stabilizer
- 212 Scissors and Sleeve
- 212 Swashplate Assembly
- Cobra Transmission (120 shp)
- New Kamatics Shaft
- 212 42 degree and 90 degree Gearbox
- New 212 Tail Rotor Blades
- 212 Tail Rotor Hub Assembly
- 212 Tail Rotor Driveshaft and Hangar Bearing Assemblies

PDF Format

Page: 1, 2, 3, 4, 5, 6

back to top